Develop & Create Accurate CPM Schedules
We can help with creating and developing schedules every step of the way through your project.
- Establish a realistic period of performance using normal, fast-track, or multi-phase techniques
- Identify long-lead and schedule-sensitive materials and equipment
- Develop a detailed project master schedule delineating trade partner, design, engineering and supplier performance obligations
- Prepare the initial as-planned baseline schedule
- Present schedules to clients
- Provide executive summary schedules
Monitor & Document Progress Updates and Issues
We will continue to monitor the schedule regularly through project completion documenting issues and fine-tuning sequencing, through analyzing trends and production.
- Update schedules, monitor performance and perform progress reports
- Pinpoint potential and actual problem areas and suggest effective solutions
- Determine the impact of delays caused by the late delivery of materials, design changes, abnormal weather, strikes, or other unforeseen factors
- Recommend and negotiate time extensions where justified
Facilitating & Training
We can assist your project by performing scheduling services and training.
- Facilitate your Last Planner System (pull planning) sessions and integrate them into the Master Schedule
- Train your project team members on various scheduling theory and software platforms, from SureTrak, Microsoft Project, P6, Phoenix, etc.
- Assisting with the scope, sequence, and resources of trade partners and suppliers for contracting and feasibility analysis
Dispute Resolution
In today’s construction industry, claims are often complex and difficult to resolve. Public owners, private developers, general contractors, and specialty contractors whose projects have been subject to major design or performance problems have increasingly sought contractual, administrative, or legal redress. Owners, contractors, and their attorneys recognize the value that a seasoned scheduling professional brings to the strategic resolution of disputes.
We can assist with:
- Conducting accurate evaluations
- Delivering concise, articulate presentations
- Developing meticulous documentation
- Serving as highly competent, well-qualified professionals who identify and quantify periods of delay impact as well as resulting damages
Because disputes often proceed through the judicial process long after project completion, the task of “reconstruction” is most often complex and time-consuming, but at the same time, critical to an equitable outcome. We can carefully reconstruct every aspect of the performance of the project, reassembling all the data, including all pertinent construction documents, technical reports, and cost records. By applying robust and defensible methodology to our analysis, we will deliver a comprehensive and objective report that documents our findings.
However, the best way to avoid disputes is to provide our clients with scheduling services that focus on identifying and assessing issues, developing proactive solutions, and preparing clear and persuasive documentation. These methods aid in avoiding, while still documenting, data that may possibly be used in later dispute resolution forums.